Stantec Consulting, on behalf of the Memorial Sloan-Kettering Cancer Center, contracted Eneractive to serve as the Commissioning Authority for the fit-out of several floors of the Evelyn Lauder Breast & Imaging Center located at 300 East 66th Street in Manhattan, NY. Through site reviews, submittal reviews, inspection and functional performance testing, the Eneractive team was able to ensure the operational goals were met.

Over 150 issues were identified by the Eneractive engineering team during the construction and acceptance phases of the project. Several energy conservation recommendations were identified in order to capture energy saving, improve indoor air quality, and improve the operation of building systems. These measures are currently being considered by the project team.

ACHIEVEMENTS

- Over 150 issues identified

- All air and waterside balancing issues corrected and verified